DOKA EUREX 30-400 ECO, used
Description:
320x DOKA EUREX 30-400eco, used.DOKA construction prop made of steel.
- Effortless loosening of the adjusting nut due to special thread geometry
- Less effort required due to low weight
- Safe to use thanks to consistently high load-bearing capacity of at least 20 or 30 kN to EN
- Easy height adjustment thanks to hole numbering
35x props DOKA EUREX 30-400 eco, used EUR 59.00 per piece
1x DOKA stacking frame, galvanized, used, 1.55x0.85 EUR 105.00 per piece
18/03/2024 - 11:02 | User #102424 | 187578 views
I offer
Austria
Unit price: 59,00 € / 1 1 saved PropsDoka
Tipologia
Props
Marca
Doka
Contact the advertiser
Related announcements
More ads from this advertiser
Doka Frami 90 x 150 Uni
DOKA FRAMI 90 x 150 Uni Light and manhandled steel-framed formwork for foundations, walls and columns The lightweight Frami formwork, with its sturdy hot-dip galvanised steel frame, ideal for fast and, with or without a crane. Can be put...
| User #102424 | Austria | 8578 views 0 saved
DOKA FRAMAX element 120 x 330 Uni
DOKA FRAMAX element 120 x 330 Uni The frames and formlining are in good condition and can be used immediately. The high-performance steel frame formwork for large-area forming with a crane. Large panel for fast shuttering. Easy cleaning...
| User #102424 | Austria | 8537 views 0 saved
Doka Frami Palet 1,20m / 1,50m
Doka Frami Palet 1,20m / 1,50m Storage and transport equipment for Frami elements Available sizes: 1,20m - EUR 155,00 per pcs. 1,50m - EUR 175,00 per pcs.
| User #102424 | Austria | 23513 views 0 saved
Hünnebeck Manto 330
Hünnebeck MANTO 330 Wall formwork for site use by crane. • strong connection through straightening clamp: 40 m² formwork surface in a crane lift without additional stiffeners • highest bending strength due to the 14 c...
| User #102424 | Austria | 43410 views 0 saved
Frami Eco Framed formwork 155m²
Frami Eco Framed formwork 155m² The crane-independent manhandled steel-framed formwork for foundations, walls and columns. The lightweight Frami eco formwork, with its sturdy steel frame, is ideal for fast and economical forming, wit...
| User #102424 | Austria | 71718 views 0 saved
PERI ERGO Prop 3,00m
PERI ERGO Prop 3,00m PERI PEP Ergo Props fully comply with Load Class B, D and E of EN 1065. The maximum load-bearing capacity is 50 kN. The complete galvanisation of all surfaces guarantees a long service life. Price per piece : E...
| User #102424 | Austria | 75888 views 0 saved
Peri pouring platform Trio
Peri pouring platform Trio Working and concreting platform for MAXIMO and TRIO. Is appended to the element from above and is self-locking. The material is in a good condition and ready for work.
| User #102424 | Austria | 87774 views 0 saved
PERI TRIO 698 m²
PERI TRIO 698 m² PERI TRIO is a cranable formwork system that can be used standing or lying down. With the patented BFD alignment lock, all element connections are made flush, flush and tight. The only necessary connecting part ...
| User #102424 | Austria | 83097 views 0 saved
PERI MAXIMO 165m²
PERI MAXIMO 165m² The MAXIMO frame formwork is effective and designed for one-sided operation. It can be used standing or lying down and has sophisticated safety technology. All floor plans can be formed using just a few element w...
| User #102424 | Austria / Salzburg | 109747 views 0 saved
HÜNNEBECK TOPEC (408 m2)
HÜNNEBECK TOPEC, 408 m2 Modular slab formwork from Hünnebeck for faster work. The Hünnebeck Topec system consists of two basic elements - panels and props. Perfect results in just a few work steps Easy handling Robust, ye...
| User #102424 | Austria / Salzburg | 132905 views 0 saved
Vedi tutti gli annunci di User #102424