New! Steel construction scaffolding UNICO73 SET 205 m2
Description:
Set of 205 m2Configuration:
1. Steel frame 200x73 L/N t - Quantity: 33
2. Platform steel 257 eco L/N - Quantity: 54
3. Railing 257 L/N t - Quantity: 70
4. Counterfort 257x200 L/N - Quantity: 9
5. Guardrail post with protection L/N t - Quantity: 9
6. Scaffold foot 60/N EG - Quantity: 22
7. Front frame L/N t - Quantity: 2
8. Aluminium and plywood platform with 257 L/N reinforced ladder - Quantity: 3
9. 19/22 N cross connector - Quantity: 11
10. Under 230 - Quantity: 11
11. Anchor connector 50 - Quantity: 11
12. Wooden plank 257 L/N t - Quantity: 30
13. Planks L/N t - Quantity: 6
14. Double front railing L/Nt - Quantity 4
The set is very stable and made of the highest quality material.
Technical data
working height 8 m
working length 25,7 m
working area 205 m2
weight 2412,20 kg
By providing the European PIN you pay the net amount (invoice).
Our logistics department will be happy to organise your transport!
Related announcements
Certified scaffold board
Galvanized platforms for right scaffolding as shown in the photograph. Strapped in packs of 50 pieces ,equipped with safety hook, measuring 50x180 cm, usable on all brands of scaffolding.
Roberto (#1003)
| Italy / Lombardia / Provincia di Brescia | 424735 views
1 saved
More ads from this advertiser
UNICO73 steel frame | 200 x 73 | Galvanized | Scaffolding
The frames are the main working element when the scaffolding is assembled vertically, consisting of two stands connected by horizontal crossbars. Steel frames of the tFRAME | UNICO73 scaffolding come in a standard system width of 732 mm ...
TELKA (#100764) | Poland | 85242 views 0 saved
Bolt Shoe | RUSHING FRAME STOCK 500x38 ERGO
TECHNICAL SPECIFICATIONS Weight [kg] 3,00 Measurement unit piece Manufacturer EU Zinc galvanic Height 500 mm Pipe diameter 38 mm Maximum adjustment range 350 mm Model 50 Base dimension 150x150mm Type of ...
TELKA (#100764) | Poland | 84481 views 0 saved
UNICO 73 STANDARD / ERGO steel platform
A platform in a scaffold may be one or more platform elements at the same level in the span, with a platform element being a prefabricated or otherwise fabricated structural element that independently carries the load to form a platform or ...
TELKA (#100764) | Poland | 83857 views 0 saved
Temporary construction fencing
Temporary construction fencing is a fast and economical way to fence off construction sites. The grating is made of high quality round steel bars. TECHNICAL DATA Weight [kg] 11,50 Measurement unit pcs. Height 2000 mm Pip...
TELKA (#100764) | Poland | 81931 views 0 saved